browse before

601.01(g) Applications Filed Without All Figures of Drawings [R-2] - 600 Parts, Form, and Content of Application


601.01(g) Applications Filed Without All Figures of Drawings [R-2]

The Office of Initial Patent Examination (OIPE) reviews application papers to determine whether all of the figures of the drawings that are mentioned in the specification are present in the application. If the application is filed without all of the drawing figure(s) referred to in the specification, and the application contains something that can be construed as a written description, at least one drawing, if necessary under 35 U.S.C. 113 (first sentence), and, in a nonprovisional application, at least one claim, OIPE will mail a "Notice of Omitted Item(s)" indicating that the application papers so deposited have been accorded a filing date, but are lacking some of the figures of drawings described in the specification.

The mailing of a "Notice of Omitted Item(s)" will permit the applicant to either: (1) promptly establish prior receipt in the USPTO of the drawing(s) at issue (generally by way of a date-stamped >itemized< postcard receipt ( MPEP § 503)); or (2) promptly submit the omitted drawing(s) in a nonprovisional application and accept the date of such submission as the application filing date. An applicant asserting that the drawing(s) was in fact deposited in the USPTO with the application papers must, within 2 months from the date of the "Notice of Omitted Item(s)," file a petition under 37 CFR 1.53(e) with the petition fee set forth in 37 CFR 1.17(h), along with evidence of such deposit ( 37 CFR 1.181(f)). The petition fee will be refunded if it is determined that the drawing(s) was in fact received by the USPTO with the application papers deposited on filing. An applicant desiring to submit the omitted drawings in a nonprovisional application and accept the date of such submission as the application filing date must, within 2 months from the date of the "Notice of Omitted Item(s)," file any omitted drawing(s) with an oath or declaration in compliance with 37 CFR 1.63 and 37 CFR 1.64 referring to such drawing(s) and a petition under 37 CFR 1.182 with the petition fee set forth in 37 CFR 1.17(h), requesting the later filing date ( 37 CFR 1.181(f)).

An applicant willing to accept the application as deposited in the USPTO need not respond to the "Notice of Omitted Item(s)," and the failure to file a petition under 37 CFR 1.53(e) or 37 CFR 1.182 with the required petition fee as discussed above within 2 months of the date of the "Notice of Omitted Item(s)" ( 37 CFR 1.181(f)) will be treated as constructive acceptance by applicant of the application as deposited in the USPTO. Amendment of the specification is required in a nonprovisional application to cancel all references to the omitted drawing, both in the brief and detailed descriptions of the drawings and including any reference numerals shown only in the omitted drawings. In addition, **>an amendment with replacement sheets of drawings in compliance with 37 CFR 1.121(d)< is required in a nonprovisional application to renumber the drawing figures consecutively **, if necessary, and amendment of the specification is required to correct the references to the drawing figures to correspond with any relabeled drawing figures, both in the brief and detailed descriptions of the drawings. Such amendment ** should be ** >submitted as a< preliminary amendment * prior to the first Office action to avoid delays in the prosecution of the application.

The treatment of an application subsequent to the mailing of a "Notice of Omitted Item(s)" is discussed in MPEP § 601.01(d).

Applications are often filed with drawings with several views of the invention where the views are labeled using a number-letter combination, e.g., Fig. 1A, Fig. 1B, and Fig. 1C. OIPE will not mail a "Notice of Omitted Item(s)" if a figure which is referred to in the specification by a particular number cannot be located among the drawings, if the drawings include at least one figure labeled with that particular number in combination with a letter. For example, if the drawings show Figures 1A, 1B, and 1C and the brief description of the drawings refers only to Figure 1, this is an error in the specification which must be corrected, rather than an application filed without all figures of drawings.

APPLICATION LOCATED IN A TECHNOLOGY CENTER

If it is discovered that an application, located in a Technology Center (TC), was filed without all of the drawing figure(s) referred to in the specification, and a Notice of Omitted Items has not been mailed by the OIPE, the examiner should review the application to determine whether the application is entitled to a filing date. An application is entitled to a filing date if the application contains something that can be construed as a written description, at least one drawing figure (if necessary under 35 U.S.C. 113, first sentence), and at least one claim.

Application Entitled to a Filing Date

If the application is entitled to a filing date, the examiner should notify applicant of the omission in the next Office action and require applicant to do one of the following:

(A) accept the application, as filed, without all of the drawing figure(s) referred to in the specification;

(B) file any omitted drawing figure(s) with an oath or declaration in compliance with 37 CFR 1.63 and 37 CFR 1.64 referring to the omitted drawing figure(s) and a petition under 37 CFR 1.182 with the petition fee set forth in 37 CFR 1.17(h), requesting the date of submission of the omitted drawing figure(s) as the application filing date; or

(C) file a petition under 37 CFR 1.53(e) with the petition fee set forth in 37 CFR 1.17(h) alleging that the drawing figure(s) indicated as omitted was in fact deposited with the USPTO with the application papers, including any and all evidence supporting the allegation. See MPEP § 503. The petition fee will be refunded if it is determined that the drawing figure(s) was in fact received by the USPTO with the application papers deposited on filing.

If applicant is willing to accept the application, as filed, without all of the drawing figure(s) referred to in the application (item A above), applicant is required to submit (1) an amendment to the specification canceling all references to the omitted drawing figure(s) including any reference numerals shown only in the omitted drawing figure(s), (2) **>an amendment with replacement sheets of drawings in compliance with 37 CFR 1.121(d)< renumbering the drawing figure(s) submitted on filing consecutively, ** and (3) a further amendment to the specification correcting references to drawing figure(s) to correspond with the relabeled drawing figure(s), both in the brief and detailed descriptions of the drawings. The amendment **should be submitted in response to the Office action.

Any petition filed in accordance with item B or C above should be filed with the TC. The TC will match the petition with the application file and forward the application file with the petition to the Office of Petitions, along with a brief explanation as to the drawing figure(s) that has been omitted on filing, for consideration of the petition in due course.

Application NOT Entitled to a Filing Date

If upon review of the application, the examiner determines that the application is NOT entitled to a filing date because the application does not contain any drawing figure, and at least one drawing figure is necessary under 35 U.S.C 113, first sentence, the examiner should forward the application to OIPE for mailing of a "Notice of Incomplete Application."

browse after